I have 4 locations connecting to HQ. 2 of them are working perfect.
The 3rd one, is showing "An error Ocurred while attempting to process the worksheet" message, and stops the 401 ws schedule.
The 4th Has a store synchronization scheduled, but is marked with a yellow (!) triangle, and whenever the store contacts HQ, the connection goes down in a couple of seconds.
Is there any suggestion on how to proceed with this problem?
Samuel